
The Industrial Projects Team of Navigators Shipping and Logistica, members to the Worldwide Project Consortium (WWPC) for Bahrain, together with their Ground Handling Division recently executed a meticulously planned overland transport movement involving critical converter reactor and insulator accessories.
The cargo, consisting of 14 packages with a total weight of 110 metric tons, was received at Jebel Ali Port and promptly handled with the highest level of operational precision. Following the completion of all port clearance formalities, the cargo was carefully prepared for onward transportation.
Converters were securely packed in iron boxes of 2.4 x 2.4 x4.4 meters and accessories in wooden boxes of bigger dimensions, before transporting the cargo to the destination.
Given the size, weight, and sensitivity of the industrial equipment, the movement required detailed planning, specialized handling, and seamless coordination between multiple operational teams. Through careful route planning and strict adherence to safety and transport protocols, the shipment was successfully moved by land to the client’s project site in the GCC region.
This operation once again highlights Navigators’ capability in managing complex industrial project cargo, ensuring that even the most demanding logistics challenges are delivered with accuracy, efficiency, and reliability.


